- Home
- /
- Processes
Processes
OUR PROCESS
Our Proven Process
LA RIQUEZA GLOBAL HOLDINGS LIMITED coordinates a structured sourcing, quality-control and delivery workflow from initial enquiry through to arrival in Singapore.
01
Inquiry & RFQ (Request for Quote)
You provide: product specifications (drawings/photos), applicable Singapore or project standards, estimated quantity and forecast, target price (if any), packaging/branding needs, Singapore delivery port or location, preferred Incoterm and timeline.
We deliver: a feasibility check + clarifying questions, initial sourcing plan (factory shortlist), proposed materials & options, and an RFQ intake confirmation within 48 hours.
Decision points: OEM/ODM level, stock vs. made-to-order, and sample requirement.
02
Solution & Quotation
We deliver: itemized quotation with:
- Incoterm options (EXW, FOB China port, CIF Singapore, DAP, and DDP where available)
- Unit price tiers by MOQ and volume breaks
- Tooling/Mold cost (if any) with amortization options
- Sample cost & credit policy (sample cost credited against PO above a threshold)
- Estimated lead times (sampling, production, shipping)
- Warranty & after-sales terms summary
You decide: the configuration, Incoterm, and payment method.
03
Samples & Validation (if needed)
We deliver: production-grade samples or 3D prototypes; sample photos/videos; and a sample datasheet documenting materials, dimensions, finish, labelling, and tests performed.
Quality options:
- Golden sample sign-off
- Third-party testing through SGS, TÜV, BV, Intertek or another agreed laboratory where Singapore, controlled-goods or project requirements apply
- Aesthetic/functional tests guided by your specs
Timeline: 5–14 days typically (expedited courier available).
04
Terms & Contract
Documents: Proforma Invoice (PI) and Sales Contract covering:
- Scope and technical specification
- Pricing, currency, and validity
- Payment terms (e.g., T/T 30% deposit, 70% balance before shipment; L/C at sight; or OA for approved accounts)
- Incoterm & port (e.g., FOB Shenzhen/Ningbo/Shanghai; CIF/CFR; DDP on request)
- Lead time, delivery window, penalties, and warranty
- IP & confidentiality (NDA) if needed
You provide: signed/stamped PI/Contract and (if applicable) tooling approval.
05
Purchase Order & Deposit
You provide: official PO and initial payment per agreed terms.
We deliver: order confirmation, locked production slot, and a critical path schedule with key milestones (materials ETA, pilot run, mass production start, QC gates, shipment window).
06
Production & In-Process Quality Control
Our approach:
- IQC (Incoming Quality Control) on raw materials & components
- First Article Inspection (FAI) and pilot run sign-off
- IPQC (In-Process QC) per AQL sampling (e.g., ANSI/ASQ Z1.4)
- OQC (Outgoing QC) before packing
- Process capability checks (where applicable)
Updates you receive: weekly progress report with photos/videos; yield & defect summaries; any ECO (engineering change order) requests for your approval if needed.
Packaging: retail, neutral or custom; barcodes where required; Singapore labelling instructions; shipment-ready palletisation; and ISPM 15-compliant wood packaging when applicable.
07
Pre-Shipment Inspection & Compliance
Options:
- Pre-Shipment Inspection (PSI): AQL-based by us or 3rd party (SGS/BV/TÜV)
- Container loading supervision (CLS)
- Lab tests and certifications: material certificates and evidence of compliance with applicable Singapore controlled-goods, safety, IMDA or project requirements where relevant
We deliver: final QC report (photos, measurements, AQL results) and compliance certificates (if performed).
08
Logistics Booking & Export Clearance
We handle: space booking, VGM, HS code confirmation, export declaration in China, and cargo insurance when applicable.
Standard documentation:
- Commercial Invoice (CI) & Packing List (PL)
- Bill of Lading (B/L) or AWB
- Certificate of Origin: RCEP or ASEAN–China FTA documentation where eligible and requested
- Fumigation/Phytosanitary certificate (if required)
- Insurance Certificate (if CIF/CIP)
Incoterm guidance:
- FOB: we deliver to the named China port; you nominate the forwarder
- CIF/CFR: we manage main carriage and (for CIF/CIP) insurance
- DDP (on request): we coordinate Singapore import clearance and last-mile delivery through approved partners where available for the product category
09
International Shipping
Modes & transit times (typical):
- Express/Courier: 3–7 days (samples/urgent small lots)
- Air freight: 5–12 days door-to-airport/door
- Sea freight (FCL/LCL): timing is confirmed by route and sailing schedule for the nominated China-to-Singapore lane
- Singapore delivery: port, warehouse or final-mile coordination is arranged where included in the quotation
Tracking: sailing/flight details and live updates. For FOB, we coordinate with your forwarder for smooth handover.
10
Delivery, Balance, & After-Sales Support
- For T/T terms: we issue shipping docs (scan first, originals by courier if needed) for your bank to release balance
- For L/C: we present documents to the bank as per LC terms
- We support customs clearance coordination via the forwarder/broker
After-sales: warranty process, spare parts, and feedback review meeting to plan next orders
OUR PROCESS
Roles & Responsibilities
Clear division of tasks at each phase
Phase
Our Responsibilities
Your Responsibilities
RFQ & Quote
Feasibility, factory match, pricing, lead time
Specs, target standards, volume plan
Samples
Produce samples, tests, datasheet
Test & approve, feedback
Contract
PI/Contract, timeline, risk plan
Sign/stamp, payment terms confirmation
Production
Material control, IPQC/OQC, status reports
Timely approvals, deposit, artwork/branding
Pre-Shipment
PSI/CLS, compliance, docs
Approve shipment, arrange balance/LC
Logistics
Booking, export clearance, insurance (if applicable)
For FOB: nominate forwarder; for DDP: confirm delivery details
Pre-Shipment
Warranty, spare parts, continuous improvement
Feedback, claims if any within warranty window
OUR PROCESS
Additional Information
Payment Terms
T/T: 30% deposit + 70% balance before shipment (standard)
L/C at sight: For large orders or new accounts
OA/Net Terms: For established clients after credit review
Escrow/Alibaba Trade Assurance: Available on request for select SKUs
Currencies: SGD or USD; other currencies by agreement.
Quality & Compliance Framework
Standards: AQL per ANSI/ASQ Z1.4 (default General II unless otherwise agreed)
Traceability: Batch/lot numbers on cartons; retain samples
Regulatory support: Guidance on applicable Singapore controlled-goods, product-safety, IMDA, import-document and agreed project requirements.
Sustainability options: Recyclable packaging, FSC paper, supplier social audits on request
Incoterms Quick Guide
Which should you choose?
FOB (Recommended for most importers)
Best control over freight cost; you or your forwarder handles main carriage
CIF/CIP
We include freight (and insurance for CIF/CIP); simpler for you if you don't have a forwarder
DAP/DDP
End-to-end, including import duty/taxes and last-mile (availability depends on destination & product category)
Risk Management
- Price lock windows for volatile materials
- Alternate supplier qualification for critical components
- Buffer stock or staggered shipments on long programs
- Force majeure clause and disaster recovery plan
Warranty & Claims
Standard: 12-month manufacturing warranty (category-dependent; defined in contract)
RMA process: Report → evidence review → replacement/credit within agreed SLA
Communication & Reporting Cadence
- Dedicated account manager + bilingual sourcing team
- Weekly production updates; ad-hoc critical alerts within 24 hours
- QC reports at each gate (FAI/IPQC/OQC/PSI) with photos and measurements
- Shared folder for drawings, approvals, and documents
Ready to Start Your Singapore Project?
Let’s turn your vision into reality with our transparent and efficient process
1. Send Specs
Target standards, quantity, destination, and preferred Incoterm
2. Receive Quote
Within 1–3 business days with detailed pricing and timeline
3. Place Order
Approve sample (if needed) and start production